Steel mills, foundries, and smelting plants operate under some of the most punishing conditions on Earth. The equipment used in melt shops and rolling mills must withstand extreme continuous heat, massive thermal shocks, and brutal abrasive wear.

With 180 acres of manufacturing space, massive heat treatment furnaces, and 250-ton lifting capacities, Openex is purpose-built to fabricate and machine the colossal, thick-walled weldments required by the metallurgical industry. We build critical equipment for Basic Oxygen Furnaces (BOF), Electric Arc Furnaces (EAF), and continuous casting facilities globally.

Equipment Built for Steel Mills & Foundries

We work directly from OEM and plant engineer blueprints to fabricate massive, fully integrated metallurgical equipment.

Melt Shop Equipment

We utilize heavy-plate heat-resistant steels to fabricate components exposed to molten metal and direct flame.

  • Scrap Charge Buckets (Clamshell)
  • Teeming & Transfer Ladles
  • Tundish Cars & Frames
  • Electric Arc Furnace (EAF) Shells

Rolling Mill Components

Our heavy 5-axis CNC machining centers provide the exact tolerances needed for heavy structural and rotational loads.

  • Rolling Mill Stands & Housings
  • Heavy Gearbox Housings
  • Work Roll Chocks
  • Billet & Slab Cooling Beds

Heavy Material Handling & Process Ductwork

Handling bulk raw materials like slag, iron ore, and coal destroys standard equipment quickly. We heavily process AR400/500 Hardox wear-plates for extreme-duty hoppers, skip cars, slag pots, and heavy transfer carts.

We also fabricate the massive, large-diameter industrial ductwork, water-cooled duct sections, and baghouse components required to handle the intense exhaust gases expelled during smelting.

Crucial Capabilities for the Steel Industry

Manufacturing Advantage Why it matters for Steel Mills
Thermal Stress Relief (PWHT) Furnace parts must not warp when introduced to 3000°F environments. Our massive on-site heat treatment ovens stabilize huge weldments prior to machining and delivery.
Heavy Lifting & Factory Space Melt shop assemblies are massive. With 180 acres of space and 250T lifting cranes, we fully assemble and fit-test structures (like ladles on transfer cars) indoors.
Heavy Plate Submerged Arc Welding Ladles holding hundreds of tons of molten steel cannot fail. We use highly controlled, 100% UT-tested SAW (Submerged Arc Welding) for flawless deep penetration joints.

Stress-Free Fabrication Guaranteed

To prevent distortion under extreme load and heat, 100% of our heavy metallurgical weldments pass through our on-site post-weld heat treatment (PWHT) ovens prior to final heavy machining and finishing.